Healthcare · Jacksonville, FLIn progressInterior renovation of a licensed surgery center that stays open: rated CFS framing and shafts, Level 5 drywall, insulation and cleanroom-grade acoustical ceilings.
View project & 13 photos →
Medical office · Bradenton, FLIn progressNew 12,446 SF medical office shell: engineered CFS framing, DensGlass with air and water barrier, stucco, Trex composite rainscreen, stone tile and paint.
View project & 12 photos →
Restaurant · Mobile, ALIn progressNew Dutch Bros drive-thru: CMU walls, stone veneer and three-coat stucco, built by our Orlando crews in Alabama.
View project & 6 photos →
Retail · Kissimmee, FLUpcomingNew Trader Joe's store: three-coat stucco over CMU and framing, Dryvit finish and fiber-cement siding.
View project & 3 photos →
Restaurant · Cocoa, FLNew Dutch Bros drive-thru: wood framing, plywood sheathing, FRP, Dryvit EIFS and Nichiha panels.
View project & 15 photos →
Hospitality · Daytona Beach, FLNew community clubhouse and pool pavilion: three-coat stucco over lath and WRB, fiber-cement board and batten, trims and EPS column bases.
View project & 10 photos →
Industrial · DeLand, FLFull exterior system for an industrial facility: stone veneer, stucco, weather barrier and custom EIFS columns and trims, coordinated in our own 3D BIM model.
View project & 10 photos →
Hospitality · Orlando, FLGround-up structural and interior scope at a waterpark resort: engineered CFS, trusses, decking, sheathing, cement plaster, drywall, ceilings, paint, doors and hardware.
View project & 9 photos →
Retail · Orlando, FLFull exterior system for a flagship jewelry store: portland cement plaster, integrated weather barriers and a custom colored sandblast acrylic finish.
View project & 9 photos →
Restaurant · DeLand, FLFull exterior facade: EIFS with a custom colored acrylic finish, thin brick, ACM metal panels and a complete weather barrier.
View project & 7 photos →
Restaurant · Panama City Beach, FLFull exterior facade for a coastal restaurant: complete EIFS system and fiber-cement lap siding to national brand standards.
View project & 9 photos →
Restaurant · Navarre, FLFiber-cement lap siding package on a fast-turn restaurant build: WRB, wood furring, siding and finish detailing.
View project & 6 photos →
Office interiors · Orlando, FLSpecialty acoustical ceiling of suspended felt baffles in a custom color and size for an architecture firm's new downtown office.
View project & 7 photos →
Retail interiors · Clearwater, FLTargeted interior remodel of a retail store: selective demo, drywall, FRP, millwork, doors and hardware, and full interior paint.
View project & 8 photos →
Retail interiors · Tampa, FLFull interior remodel of a retail store: demo, metal framing, insulation, drywall, ACT replacement, flooring, doors and hardware, and paint.
View project & 8 photos →
Retail interiors · Orange Park, FLFull interior remodel of a retail store: demo, metal framing, insulation, drywall, ACT replacement, flooring, doors and hardware, and paint.
View project & 8 photos →A full interiors package inside an AHCA-licensed surgery center that keeps operating while we build.
Scroll sideways through the photos, or click one to see it full screen.
We are self-performing the full interior framing and drywall scope for Schaefer General Contracting on the renovation of Ashchi Surgery Center in Jacksonville. New partitions run from 12 feet up to 30 feet and tie into the building's existing wood scissor trusses, with head-of-wall details built to a Hilti engineering judgement.
The package covers new 1-hour and 2-hour rated walls, 1-hour and 2-hour shaft walls, a 1-hour horizontal ceiling membrane, STC-50 partitions, lead-lined board at the imaging rooms and Level 5 finish on walls and ceilings. We also install the acoustical ceilings, including USG Clean Room Climaplus panels on a gasketed grid for the surgical suites.
The surgery center stays open throughout, so the work runs behind ICRA hard barriers under negative air, inside set noise windows and after hours where needed. Our team modeled the job in BIM to coordinate the tall framing against the existing trusses and the MEP above.
The whole exterior envelope of a new medical office building, engineered for 150 mph wind.
Scroll sideways through the photos, or click one to see it full screen.
We are building the exterior envelope of the new Wang Medical Office Building in Bradenton for Uprite Construction. The one-story, 12,446 SF shell is designed for 150 mph wind, Exposure C, and our CFS framing follows an engineered delegated design: two corner towers, eight storefront fins standing almost 23 feet tall, portal bulkheads and parapet attachments.
Over the framing goes 5/8" DensGlass with Dryvit Backstop NTX air and water barrier, then three-coat portland cement stucco with a Dryvit Sandblast finish. The towers and portals get Trex Transcend Lineage composite cladding as a ventilated open-joint rainscreen, plus large-format travertine stone tile.
Up on the roof we frame the engineered CFS screen walls around the RTUs with CDX plywood. We also paint the electrical room, HM doors, dumpster enclosure, gates, bollards and canopies. The Trex cladding was laid out in our own BIM model, piece by piece, to produce an exact bill of materials before ordering.
Masonry, stone and stucco for a new Dutch Bros drive-thru, our first job in Alabama.
Scroll sideways through the photos, or click one to see it full screen.
We are building the masonry shell and exterior finishes of a new Dutch Bros Coffee in Mobile, Alabama, for CS Development Services. The job was awarded in October 2026 and our crews travel from Orlando to run it.
Our scope starts with the CMU walls and columns, including the block under the wood canopy at the drive-thru lanes. Over the block go the stone veneer accents and three-coat portland cement stucco on the main elevations.
The full stucco and siding package for a new Trader Joe's in Kissimmee.
Scroll sideways through the photos, or click one to see it full screen.
We were awarded the exterior wall package for the new Trader Joe's at Loop West in Kissimmee, working for Collins and Arnold Construction on drawings by Dorsky + Yue.
Through value engineering with the design team, the walls moved to 7/8" traditional three-coat stucco over lath and a fluid-applied air and water barrier at both the CMU and the framed walls. The finish is Dryvit Color Prime with a Dryvit acrylic texture, with PVC trims throughout, and the elevations also carry smooth fiber-cement siding.
We drew the stucco trim layout shop drawings in house, and submittals for the weather barriers and cement plaster are under way now.
Our first wood-framed building, from the walls up to the finished EIFS and Nichiha facade.
Scroll sideways through the photos, or click one to see it full screen.
We built the shell and exterior of a new Dutch Bros Coffee in Cocoa for Schaefer General Contracting. It was our first wood-framed building: the walls were panelized on the ground and stood in place, then we set the trusses and sheathed the structure in plywood.
Outside, the building is wrapped in Dryvit Outsulation Plus MD EIFS, and the tower is clad in Nichiha fiber-cement panels, primed and painted in the field. Inside, we hung the FRP wall panels in the back of house, our first FRP job.
The full exterior finish of a new clubhouse and pool pavilion, from the barrier coat to the last trim.
Scroll sideways through the photos, or click one to see it full screen.
We finished the exterior of the new Tomoka Clubhouse in Daytona Beach for Collins and Arnold Construction. The work covered the main clubhouse and the pool pavilion, both built in CMU and framing that we wrapped from the base to the parapet.
Over the air and water barrier and metal lath we applied three-coat portland cement stucco on the clubhouse walls, the pavilion and the grill station. The gables and entry carry fiber-cement board and batten siding and panels with matching trims, and we installed the EPS column bases around the portico.
Stucco wrapped up in May 2026. We came back after the other trades to add stucco at the grill station and to replace column bases damaged during the tile work, so the clubhouse was handed over clean.
Stone veneer, stucco and custom EIFS architecture, coordinated in BIM before a single piece was fabricated.
Scroll sideways through the photos, or click one to see it full screen.
For S.A. Casey Construction we delivered the complete exterior system at Coastline Power Solutions in DeLand: stone veneer cladding, stucco assemblies, the full weather barrier and custom architectural EIFS columns and trims.
Our in-house technical team built a full 3D BIM model of the facade to check geometry, coordinate attachment points and refine the custom EIFS profiles before fabrication. That work eliminated field conflicts and kept every column and trim lined up with the design intent.
Completed in July 2026.
Structure, envelope and interiors on a resort renovation, delivered by one crew in two phases.
Scroll sideways through the photos, or click one to see it full screen.
In collaboration with NGL Group, we took on the full ground-up structural and interior scope for the Holiday Inn Waterpark Renovation in Orlando.
Our crews built engineered CFS systems, cold-formed framing and CFS trusses, installed metal decking, exterior sheathing and weather barrier, and finished the envelope in cement plaster. Inside we framed, hung and finished the drywall, insulated, installed acoustical ceilings, painted, and set the doors and hardware.
Phase 1, the Oasis building, was completed in August 2025. Phase 2, the Lagoon building, has also been completed.
A clean, high-end stucco exterior delivered in phases under strict quality control.
Scroll sideways through the photos, or click one to see it full screen.
For Renovo Construction we installed the full exterior system at Diamonds Direct in Orlando: portland cement plaster over integrated weather barriers, topped with a custom colored sandblast acrylic finish.
The work ran in multiple phases, with strict quality control at every stage to deliver the clean, consistent look a luxury retail brand expects. Completed in August 2025.
A complete restaurant facade in four materials, built to brand standards.
Scroll sideways through the photos, or click one to see it full screen.
For Stansell Construction we delivered the full exterior facade of the new KFC in DeLand.
The package combined EIFS with a custom colored acrylic finish, thin brick, ACM metal panels and a complete weather barrier behind all of it, detailed so the transitions between materials stay tight and watertight. Completed in January 2026.
A brand-standard McDonald's facade built for the coastal Florida climate.
Scroll sideways through the photos, or click one to see it full screen.
For Stansell Construction we built the full exterior facade of the McDonald's in Panama City Beach, with a complete EIFS system and fiber-cement lap siding.
Everything was installed to McDonald's national brand standards and detailed for the wind, salt and moisture of coastal Florida. Completed in March 2026.
A custom felt baffle ceiling for PBK Architects, delivered on a tight schedule.
Scroll sideways through the photos, or click one to see it full screen.
We furnished and installed a specialty acoustical system of suspended felt baffles, in a custom color and size, for PBK Architects' new downtown Orlando office.
The baffles had to land exactly on the design layout and control sound in an open office, all on a tight move-in schedule. Completed in February 2026.
A fast interior refresh, delivered while keeping the store's brand standards.
Scroll sideways through the photos, or click one to see it full screen.
For Image One Industries we completed a targeted interior remodel of the Verizon store in Clearwater.
The scope covered selective demolition, drywall, FRP, millwork, doors and hardware, and full interior paint, all turned around quickly to get the store back to selling. Completed in June 2025.
A complete store interior, from demo to final paint.
Scroll sideways through the photos, or click one to see it full screen.
For Image One Industries we completed a full interior remodel of the Verizon store in Tampa.
We handled demolition, metal framing, insulation, drywall, acoustical ceiling replacement, new flooring, doors and hardware, and paint. Completed in April 2025.
The same full remodel package, delivered in Orange Park.
Scroll sideways through the photos, or click one to see it full screen.
For Image One Industries we completed a full interior remodel of the Verizon store in Orange Park, running alongside the Tampa store.
The scope covered demolition, metal framing, insulation, drywall, acoustical ceiling replacement, new flooring, doors and hardware, and paint. Completed in April 2025.